1.15 Initial commissioning / daily start-up
Ensure that:
○ All safety devices are completely available
and functional.
○ All connections are correctly connected.
○ All parts are correctly installed.
○ All components used must be designed
according to the maximum operating
pressure and the maximum respectively
minimum ambient temperature.
○ No parts of the centralized lubrication
system may be subjected to torsion,
shear, or bending.
○ Check all parts prior to their usage for
contamination and clean, if necessary.
○ Lubricant lines should be primed with
lubricant prior to installation. This makes
the subsequent ventilation of the central-
ized lubrication system easier.
○ Observe the specified tightening torques.
When tightening, use a calibrated torque
wrench.
○ When working with heavy parts use suit-
able lifting tools.
○ Avoid mixing up or wrong assembly
of dismantled parts. Mark these parts
accordingly.
1.16 Cleaning
○ Risk of fire and explosion when using
inflammable cleaning agents Only use
non-flammable cleaning agents suitable
for the purpose.
○ Do not use aggressive cleaning agents.
○ Thoroughly remove residues of cleaning
agents from the product.
○ If possible, do not use steam jet and high
pressure cleaners.
○ Mark damp areas accordingly.