EasyManua.ls Logo

SMA CLUSTER CONTROLLER

SMA CLUSTER CONTROLLER
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Assembly SMA Solar Technology AG
22 ClusterController-IA-en-10 Installation Manual
Observe minimum clearances:
Figure7: Minimum clearances
Maintain the minimum clearance to walls and other devices or objects.
Observe permitted mounting position:
Mount the Cluster Controller in such way, that the ventilation slots face the top and the bottom.
This ensures adequate ventilation and avoids overheating of the Cluster Controller.
Figure8: Permitted and prohibited mounting positions

Table of Contents

Other manuals for SMA CLUSTER CONTROLLER

Related product manuals