6 Connection SMA Solar Technology AG
38 ClusterController-IA-en-10 Installation Manual
3. Insert the eight-pole plug at terminal X8 into pin row A.
4. On the connection cable, mark the terminal and pin row to which the connection cable is
assigned. For this purpose, use the cable ties with the caption field.
5. On the supplementary sheet for noting the connected devices, note the terminal to which the
sensor is assigned.
6. Adjust the characteristic curve of the irradiation sensor or pyranometer via the user interface of
the Cluster Controller (see the Cluster Controller user manual). The measured irradiation values
can therefore be shown on the display and the user interface of the Cluster Controller.

Table of Contents

Other manuals for SMA CLUSTER CONTROLLER

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SMA CLUSTER CONTROLLER and is the answer not in the manual?

SMA CLUSTER CONTROLLER Specifications

General IconGeneral
Data LoggingYes
DisplayLCD
Power Supply24 V DC
Remote MonitoringYes
Protection ClassIP20
Communication InterfacesEthernet
Product TypeController
ManufacturerSMA

Related product manuals