Wire EDM Machine Operation Chapter 16
Copyright November, 98 Page 16-3 Sodick Inc.
2) Press the “ON” button to turn on the light and functions located inside the
white border at the top of the remote.
3) On the RIGHT side press and hold the “VERT” button .
4) Under Vertical Alignment, press the direction you want the wire to travel to
spark on the block (do not use jog keys).
The C777 Condition file will be loaded into the generator and the wire run will turn on.
The generator will turn on and the screen will go into Incremental.
5) When the above happens, let go of buttons. The wire will start moving toward
the block.
6) Press the “XYZUVW” button on the LEFT side to switch it to “U V axis”
mode, the UVW light turns on.
7) When the wire starts sparking on the block, jog the U or V axis to get a
consistent spark from top to bottom of the block.
Use the MFR button on the remote to achieve the desired speed for jogging the U and V
Axis during this procedure.
8) After the U & V Axis are aligned go to “MAL”, “MDI” and type G90 and
press ENTER to go back to Absolute.
9) Type G97UV and press ENTER to zero out the U & V Axis in all 59 work
coordinate screens.