Monitoring Platform
Themonitoringplatformenablesmonitoringthetechnicalandfinancialperformanceofoneormore
SolarEdgesites.Itprovidespastandpresentinformationonthesystemperformancebothatthesystem
andmodulelevels.
Supported ACGrids
ThefollowingsectionshowstheACgridssupportedbytheinverters(modeldependent).
Groundconnectionisrequiredforallgrids,asdescribedinConnectingtheACGridandGroundingtothe
ConnectionUnitonpage37.
Figure 3: AC grids supported by SolarEdge three-phase inverters
NOTE
Somethreephaseinverterssupportthe208VDeltagrid.RefertoSettingtheInverterto
Support208V3-wireGridonpage41.
Installation Procedure
ThefollowingistheprocedureforinstallingandsettingupanewSolarEdgesite.Manyofthesealsoapply
tomodificationofanexistingsite.
1. InstallingthePoweroptimisers,page14
2.
MountingandConnectingthePrimaryandSecondaryUnit(s),page29
NOTE
It is recommended to connect communication connections (step 6 of this installation) before
connecting the AC, for easier access to the communication board.
3. ConnectingtheACandtheStringstotheConnectionUnit,37
4.
ActivatingandCommissioningtheSystemUsingSetApp,page42
5. ConfiguringtheSystemUsingSetApp,page44
6. SettingUpCommunicationpage57
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
12