Chapter 3: Installing the Primary and
Secondary Unit(s)
Installtheunitseitherbeforeorafterthemodulesandpoweroptimisershavebeeninstalled.
FirstinstallthePrimaryUnit,thentheSecondaryUnit(s)(inanyorder).
Primary Unit Package Contents
l PrimaryUnit(comprisedofaninverterandConnectionUnit)andpre-assembledcablesthatconnect
totheSecondaryUnit(s)
l Mountingbracketkit
l TwoAllenscrewsforfasteningtheunittothemountingbracket
l Level,formarkingthemountingbrackets'positions
l Cablelock(s)
l Forbuilt-inwirelesscommunication:antennaandmountingbracket
l Installationguide
Secondary Unit Package Contents
l SecondaryUnit
l Mountingbracketkit
l TwoAllenscrewsforfasteningtheunittothemountingbracket
l Machinescrewsforconnectingtheinterlocks
l Conduits
Identifying the Units
ThestickersonthePrimaryUnitandontheConnectionUnitspecifytheinverter'sSerial Numberand
Electrical Ratings.
WhenopeningasiteintheSolarEdgemonitoringplatformandwhencontactingSolarEdgesupport,
providetheinverter'sserialnumber.
Primary Unit Interface
Figure 10: Primary Unit interface
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
22
Chapter 3: Installing the Primary and Secondary Unit(s)