CAUTION!
Installing a SolarEdge system without ensuring compatibility of the module connectors with the
optimiser connectors may be unsafe and could cause functionality problems such as ground faults,
resulting in inverter shut down. To ensure mechanical compatibility of the SolarEdge optimisers’
connectors with the PV modules’ connectors to which they are connected:
l Use identical connectors from the same manufacturer and of the same type on both the power
optimisers and on the modules; or
l Verify that the connectors are compatible in the following way:
o
The module connector manufacturer should explicitly verify compatibility with the SolarEdge
optimiser connector; and
o
A third-party test report by one of the listed external labs (TUV, VDE, Bureau Veritas UL, CSA,
InterTek) should be obtained, verifying the compatibility of the connectors.
ATTENTION!
Les connecteurs du module doivent être mécaniquement compatibles avec les optimiseurs de
puissance. Sinon, le système SolarEdge installé peut être dangereux ou causer des problèmes
fonctionnels, tels que les défauts de terre, qui peuvent provoquer un arrêt de l’onduleur. Afin d'assurer la
compatibilité mécanique entre les optimiseurs de puissance SolarEdge et les modules auxquels ils sont
connectés:.
l Utiliser des connecteurs identiques du même fabricant et du même type aussi bien pour les
optimiseurs de puissance que pour les modules.
l rifiez que les connecteurs sont compatibles de la manière suivante:
o
Le fabricant du connecteur doit explicitement vérifier la compatibilité avec le connecteur
SolarEdge.
o
Un rapport de test de tierce partie doit être effect par l’un des laboratoires externes indiqués ci-
dessous:(TUV, VDE, Bureau Veritas UL, CSA,Intertek), qui vérifiera la compatibilité des
connecteurs.
Package Contents
l Poweroptimisers
l Stainlesssteelgroundinglockwashers
Installation Guidelines
l Frame-mountedpoweroptimisersaremounteddirectlyonthemoduleframe,
regardlessofrackingsystem(rail-lessorwithrails).Forinstallationofframe-mounted
poweroptimisers,refertohttp://www.solaredge.com/sites/default/files/installing_
frame_mounted_power_optimizers.pdf.
l Thestepsinthischapterrefertomoduleadd-onpoweroptimisers.Forsmart
modules,startfromStep3:ConnectingPowerOptimisersinStringsonpage19.Also
refertothedocumentationsuppliedwiththesmartmodules.
l Thepoweroptimisercanbeplacedinanyorientation.
l Ifconnectingmoremodulesthanoptimiserinputsinparallel,useabranchcable.Somecommercial
poweroptimisermodelshaveadualinput.
l Positionthepoweroptimisercloseenoughtoitsmodulesothattheircablescanbeconnected.
l Makesuretousepoweroptimisersthathavetherequiredoutputconductorlength:
Chapter 2: Installing the Power Optimisers
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
15

Table of Contents