Step 2: Commissioning and Configuring the
Installation
ThissectiondescribeshowtousetheSetAppmenusforcommissioningandconfiguringtheinverter
settings.
Menusmayvaryinyourapplicationdependingonyoursystemtype.
To access the Commissioning screen:
Dooneofthefollowing:
l Duringfirsttimeinstallation:UponActivationcompletion,intheSetApp,tapStart Commissioning.
ThemainCommissioningmenuscreenisdisplayed.
l Iftheinverterhasalreadybeenactivatedandcommissioned:
a. IfnotalreadyON-turnONACtotheinverterbyturningONthecircuitbreakeronthemain
distributionpanel.
b. IfnotalreadyON-movetheConnectionUnitswitchtotheONposition.
c.
OpenSetAppandfollowtheinstructionsonthescreen(scantheinverterbar-code;movethe
ON/OFF/PswitchtoPposition(forlessthan5sec)andrelease).
ThemobiledevicecreatesaWi-Ficonnectionwiththeinverteranddisplaysthemain
Commissioningscreen.
Inthemainmenus,tapthemenuredarrows()toperformthesystemcommissioningorconfiguration
task.TaptheBackarrow()toreturntothepreviousmenu.
Thenextsectionsprovidemoreinformationaboutconfigurationoptions(inadditiontoCountry and
LanguageandPairing,describedinStep2:CommissioningandConfiguringtheInstallationonpage43).
Setting Country and Language
1.
FromtheCommissioningscreenselectCountry and Language.
2.
FromtheCountrydrop-downlist,selecttherequiredcountrysetting.
WARNING!
The inverter must be configured to the proper setting in order to ensure that it complies with the
country grid code and functions properly with the country grids.
AVERTISSEMENT!
L'onduleur doit être configupour le pays approprié afin d'assurer un fonctionnement convenable
avec le réseau de ce pays.
3. FromtheLanguagedrop-downlist,selectthelanguage.
4. TapSet Language.
Pairing
Onceallconnectionsaremade,allthepoweroptimisersmustbelogicallypairedtotheirinverter.The
poweroptimisersdonotstartproducingpoweruntiltheyarepaired.Thisstepdescribeshowtoassign
eachinvertertothepoweroptimisersfromwhichitwillproducepower.
Performthisstepwhenthemodulesareexposedtosunlight.Ifthestringlengthischangedorapower
optimiserisreplaced,repeatthepairingprocess.
1.
Fromthemainmenu,selectPairing.
2. TapStart Pairing.
Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
43

Table of Contents

Related product manuals