Chapter 6: Setting Up Communication
Theinvertersendsthefollowinginformationtothemonitoringplatform:
l PoweroptimiserinformationreceivedviatheDCpowerlines(thePVoutputcircuit)
l Inverterinformation
l Informationofanyotherconnecteddevices
Thischapterdescribessettingupcommunicationbetween:
l theinverterandthemonitoringplatformthroughtheInternet(wired/wireless),orthroughacellular
connection
l multipleinvertersforamaster/slaveconfiguration
Communicationsetupisnotrequiredforpowerharvesting,howeveritisneededforusingthe
monitoringplatform.
NOTE
It is recommended to connect communication connections before connecting the AC, for easier
access to the communication board.
CAUTION!
When connecting the communication cables, make sure that the ON/OFF/P switch on the Connection
Unit is turned OFF, and the AC is turned OFF.
When configuring the communication parameters, make sure that the ON/OFF/P switch on the
Connection Unit is OFF, and the AC is turned ON.
ATTENTION!
Lors de la connexion des câbles de communication, assurez-vous que l'interrupteur MARCHE/ARRÊT
à la base de l'onduleur soit en position ARRÊT, et le CA est en position ARRÊT. Lors de la
configuration des paramètres de communication, assurez-vous que l'interrupteur MARCHE/ARRÊT
soit en position ARRÊT, et le CA est en position MARCHE.
Chapter 6: Setting Up Communication
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
57