Secondary Unit Interface
Figure 14: Secondary Unit interface
l TheSecondaryunitsconnectorsareforconnectiontothePrimaryUnit:
o
DC (MC4) connectors:forconnectionofthePVinstallation
o
Communication connector:forcommunicationoptions
o
AC connector:forconnectionoftheAC
Opening Conduit Drill Guides
ThissectiondescribeshowtoopentheACandDCdrillguides.
Thisstepmaybeperformedbeforeoraftermountingtheinverter.
To open conduit drill guides:
1.
EnsurethattheConnectionUnitandinverterON/OFFswitcharesettoOFF.
2.
LoosenthescrewsonthefrontcoveroftheConnectionUnit.
Figure 15: Opening the Connection Unit cover
3. RemovetheConnectionUnitcover.
Chapter 3: Installing the Primary and Secondary Unit(s)
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
27