Creating Logical and Physical Layout using Installation
Information
Todisplayalogicallayout,inserttheinverterserialnumberinthenewsitecreatedinthemonitoring
platform.Whenthecommunicationbetweentheinverterandthemonitoringserverisestablished,the
logicallayoutisdisplayed.
Todisplayaphysicallayout,youneedtomapthelocationsoftheinstalledpoweroptimisers.Tomapthe
locations,useoneofthemethodsdescribedinthenextsections.
Designer
Designerrecommendsinverterandpoweroptimizerselectionpersitesizeandenables
reportgeneration.YoucancreateaprojectinDesignerandexportthesitedesignwith
thestringlayouttothemonitoringplatform.
Formoreinformation,refertohttps://www.solaredge.com/products/installer-
tools/designer#/.
Mapper Application
UsetheMappersmartphoneapplicationtoscanthepoweroptimiserandinverter2Dbar-codesand
createavirtualmapofaPVsiteforenhancedmonitoringandeasiermaintenance.
ThMapperapplicationisintegratedwiththemonitoringplatformandenables:
l Simpleon-siteregistrationofnewsystems.
l Creating,editingandverifyingsystemphysicallayout.
l Scanningandassigningthepoweroptimiserserialnumbertothecorrectmoduleinthesystem
physicallayout.
Fordetailedinformation,refertotheMapperdemomovies:
l CreatingnewsitesusingtheMappermobileapplication
l MappingexistingsitesusingtheMappermobileapplication
Physical Layout Editor
1. Ifyouarearegisteredinstaller,accessthemonitoringplatformsitecreationpageat
https://monitoring.solaredge.com/solaredge-web/p/home#createSites.Ifyou
havenotyetsignedup,gotohttps://monitoring.solaredge.com/solaredge-
web/p/createSelfNewInstaller.
2. Filloutallrequiredinformationinthescreen,whichincludesinformationabout
yourinstallation,aswellasdetailsaboutitslogicalandphysicalmapping.
Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
55