o
Donotuseextensioncablesbetweenamoduleandapoweroptimiser,betweentwomodules
connectedtothesameoptimiser,orbetweentwooptimisersotherthaninthecasesspecified
below.
o
Youcanuseextensioncablesbetweenpoweroptimisersonlyfromrowtorow,aroundobstacles
withinarow,andfromtheendofthestringtotheinverter,aslongasthemaximumdistanceis
notexceeded.
l Theminimumandmaximumstringlengthguidelinesarestatedinthepoweroptimiserdatasheets.
RefertotheDesignerforstringlengthverification.TheDesignerisavailableontheSolarEdgewebsite
athttps://www.solaredge.com/us/products/installer-tools/designer#/.
l Completelyshadedmodulesmaycausetheirpoweroptimiserstotemporarilyshutdown.Thiswill
notaffecttheperformanceoftheotherpoweroptimisersinthestring,aslongastheminimum
numberofunshadedpoweroptimisersconnectedinastringofmodulesismet.Ifundertypical
conditionsfewerthantheminimumoptimisersareconnectedtounshadedmodules,addmore
optimiserstothestring.
l Equipmentgroundingtighteningtorques:4-6AWG:45lb-in,8AWG:40lb-in,10-14AWG:35lb-in.
l Toallowforheatdissipation,maintaina2.5cm/1"clearancedistancebetweenthepoweroptimiser
andothersurfaces,onallsidesexceptthemountingbracketside.
Figure 4: Power optimiser clearance
l Wheninstallingmodulesinaconfinedspace,forexample,ifinstallingBuilding-integratedphotovoltaic
(BIPV)modules,ventilationmeasuresmaybeneededtoensurethepoweroptimisersarenotbe
exposedtotemperaturesoutsidetheirspecifications.
NOTE
The images contained herein are for illustrative purposes only and may vary depending on product
models.
Step 1: Mounting and Grounding the Power
Optimizers
Foreachofthepoweroptimisers
1
:
1
Not applicable to smart modules.
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.4
16
Step 1: Mounting and Grounding the Power Optimizers