l Energy:Thetotalenergyreadbythemeter.Thevaluedisplayedinthislinedependsonthemetertype
connectedtotheinverteranditslocation:
o
Ifabidirectionalmeterisconnectedattheconsumptionpoint,thisvalueistheconsumedenergy.
o
Ifthemeterisinstalledattheproductionconnectionpoint,thisvalueistheenergyproducedby
thesite.
o
Ifthemeterisinstalledatthegridconnectionpoint,thisvalueistheenergyexportedtothegrid.
NOTE
This data is accumulated according to an internal real-time clock.