153
Appendix
• Communication cable wiring procedure :
a. Use standard network cables for Master-Slave inverter connection.
b. Master inverter CAN 2 connects to Slave 1 inverter CAN 1.
c. Slave 1 inverter CAN 2 connects to Slave 2 inverter CAN 1.
d. Meter connects to Meter/CT terminal of the Master inverter. Please refer to "8.6.3
Meter/CT Connection".
CAN2 CAN1 CAN2 CAN1
Meter
Master
Slave 1 Slave 2
Figure 15-18 Communication wiring without X3-PBOX device
NOTICE!
• For details on the parallel connection of X3-PBOX device, see X3-PBOX-150kW-G2
X3-PBOX-60kW-G2 and installation guide.
• For details on the specific wiring of the inverter, see "8.3 AC Connection" and "8.6.4
CAN1/CAN2/DRM/OFF Communication Connection".