155
Appendix
When the X3-PBOX-150K-G2 or X3-PBOX-60K-G2 is connected in the parallel system,
enable the function.
=====External ATS=====
Function Control
> Enable <
Parallel Status
Displaying path: Menu>Parallel Status
NOTICE!
• Once inverter enters parallel system, the Today yield will be replaced by Parallel.
In Parallel Status interface, the whole system power and individual slave inverter power
can be obtained in Parallel Status interface of master inverter. The number displayed in
the Parallel Status interface refers to the total number of online inverters, for example two
inverters in parallel in the below figure.
====Parallel Status====
>All 2
Slave 1
====Parallel Status====
>PV
Grid
Power 5688 W
Today 500 kWh
Battery 80%
Normal
Power 5688W
Parallel Slave
Battery 80%
Normal
15.6 Meter/CT Connection Scenarios
X3-Hybrid G4 inverter series can be connected to a single batch of CTs, a direct-connected
meter, or a CT-connected meter, and also supports a Meter 2 function for you to monitor
another power generation equipment at home.
Followings are the detailed wiring and setting procedures of these scenarios. For wiring
procedure of the inverter Meter/CT terminal, see "8.6.3 Meter/CT Connection".
15.6.1 Connection of CT
NOTICE!
• Do not place the CT on the N wire or ground wire.
• Do not place CT on the N line and L line at the same time.
• Do not place the CT on non-insulated wires.
• The cable length between CT and inverter should not exceed 100 meters.
• After CT is connected, prevent the CT clip from falling off. It is recommended to wrap
the CT clip around in circles with insulating tape.