EasyManua.ls Logo

SolaX Power X3-Hybrid G4 Series - Page 67

SolaX Power X3-Hybrid G4 Series
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
59
Electrical Connection
Table 8-7 Pin assignment of BMS terminal
Pin Pin assignment
1 EXT_NTC
2 GND
3 GND
4 BMS_CANH
5 BMS_CANL
6 X
7 BMS_485A
8 BMS_485B
* The pin assignment of communication terminal on the battery must be consistent with
the assignment of Pin 4, 5, 7 and 8 above.
Wiring procedure
Step 1: Prepare a CAT5E network cable, thread the network cable through waterproof
connector (part D) and strip off the 15 mm insulation of the cable.
15 mm
Figure 8-35 Stripping the insulation
Step 2: Insert the stripped section into the RJ45 terminals (from part D). Crimp it tightly
with a crimping tool for RJ45. Pay attention to the pin order of RJ45 terminals.
Use a network cable tester to check if the cable has been correctly and properly
crimped before connecting to inverter.

Table of Contents

Related product manuals