137
Appendix
=====ExternalGen=====
>Forced Charg Period
Start Time
00:00
=====ExternalGen=====
>Allowed Disc Period
Start Time
00:00
=====ExternalGen=====
>Forced Charg Period
End Time
00:00
=====ExternalGen=====
>Allowed Disc Period
End Time
00:00
»
Charge from Gen and Charge battery to: The SOC which allows the system
charging from generator. (10-100%, 10% by default)
Dry contact mode
In this operating mode, users can intelligently control the system by establishing a dry
contact connection between the inverter and the generator. It allows for a variety of
settings to be adjusted, enabling the system to adapt to different scenarios and meet
specific requirements.
①
Wiring connection diagram
EPS loads Generator
Common loads
Meter
Grid
PV
X-
CLOUD
DC
AC
COM
CT
ATS
Control
Figure 15-2 Dry contact wiring diagram