1
2
OK
click
Complete the installation.
6.4.3 Connecting the Back Load connectors
Step 1:
Remove the dust cover.
Step 2:The installation arrow indicates insertion the female connector, and hear the “click”
sound.
OK
Complete the installation.
Step 6:Tighten the nut with an open-ended wrench (torque 2.5±0.5N·m.
UM0035_ASW05-12kH-T2-T3_EN_V01_0523