106 SUNFAR C300
C300 series of non-sensor current vector-control inverter manual
Appendix OPTIONSⅡ
1. Operation panel
Sometimes users need to take operation panel out of the inverter or control cabinet,
if users purchase panel base and wire, it is convenient to install and debug. Wire
between operation panel and inverter should be less than 15m. If the length is
above 15m, long-distance control line is needed.
1.1 Appearance of panel base
41.5
DOWNUP
SET REV
ESC
<<
STOP
FWD
72
RUN Hz AV
16
It is recommended that user takes Fig-B
Hole dimension of panel base.
Fig-B Dimension of panel base
Fig-A Dimension of panel