SINGLE PHASE HI 10/12kW | User Manual62
Advanced Function Setup
Grid peak shaving: When this is selected, the grid output power will be limited within the set value. If
the load power exceeds the allowed value, it will take PV energy and stored battery energy to supple-
ment. If there is not enough PV energy or stored energy to meet the load requirement, grid power will
increase to meet the load needs.
coil
external relay
open
contact
L N ATS
load port
shell
Ground cable
230V
Inverter
External relay
This page shows the daily, monthly, yearly, and total solar power produced. Access this page by clicking on
the ‘Solar/Turbine’ icon on the Home Page.
Solar Power Generated