EasyManua.ls Logo

Suzuki Wagon R Plus RB413 - Page 735

Suzuki Wagon R Plus RB413
846 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7B1-166 AUTOMATIC TRANSAXLE (M13 ENGINE)
Inspection
1) Hold differential case subassembly with soft jawed vice and
set special tools as shown.
Special tool
(A): 09900-20607
(B): 09900-20701
2) Measure differential gear thrust play.
Differential gear thrust play:
0.05 0.20 mm (0.002 0.008 in.)
3) If thrust play is out of specification, replace differential case
subassembly.
Assembly
1) Put final driven gear in water vessel, heat and remove when
it boils, then remove moisture.
2) As shown in figure, facing groove (2) side upward, install final
driven gear (1) to differential case.
WARNING:
When taking warmed final driven gear out of vessel,
use tongs or the like. Taking out it with bare hand will
cause severe burn.
While installing warmed final driven gear, use oven
glove such as leather glove. Picking up it with bare
hand may cause burn.
CAUTION:
Do not leave final driven gear in boiling water for longer
than 5 min. Overheating the gear may cause strength
reduction of gear.
NOTE:
After removing moisture on final driven gear, install final
driven gear to differential case as quickly as possible.

Table of Contents

Related product manuals