6:2 (2), 0-004-7614-0 (GB) TAC AB, 1998-10-23
TAC 2413 Handbook Troubleshooting
Problem Check that...
The temperature in the the AHU is in timed operation and
ventilation system is too high no holiday program is active
an alarm has not stopped
the AHU
high current protectors and
power switches are on
the heating valve is controlled,
but if the cooling is active, that
it is completely closed
heat recovery is active, but if
the cooling is active, that cooling
recovery is active
the cooling valve is controlled
the cooling media temperature
is correct
the cooling compressor/
the DX step is correctly
installed
The calculated setpoint does setpoints and their maximum and
not appear to be correct minimum limits are correct
the setting of any possible
outdoor compensation is correct
any possible SPC effect at 2
and 10 V is set correctly