EasyManua.ls Logo

Toro 41177 Multi-Pro 1250 - Page 31

Toro 41177 Multi-Pro 1250
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 26
1. Rinse tank (for use with the optional rinse kit, 106-4842)
1. Stop the spra yer , set the parking brak e , place
the rang e selector in the Neutral position, and
tur n off the engine . T he tank will drain to left
side of the mac hine .
2. Locate the tank drain v alv e on the left side of
the mac hine ( Figure 27 ). T he v alv e is on the
frame in front of the fuel tank.
Figure 27
1. Tank drain handle
Open the v alv e to drain any un used material
from the tank and dispose of it according to
local codes and the material man ufacturer’ s
instr uctions ( Figure 28 ). After draining,
remo v e the lync h pin on the brac k et securing
the drain v alv e to the mac hine and let the v alv e
rest on the g round . T his allo ws any residual
material in the line to drain.
G005482
2
3
1
Figure 28
1. Valve open 3. Valve closed
2. Lynch pin
3. W hen the tank has drained completely , install
the v alv e to frame with the lync h pin remo v ed
previously and close the drain v alv e ( Figure 28 ).
4. Fill the tank with at least 50 US g allons (190 L)
of clean fresh w ater and close the co v er .
Note: Y ou can use a cleaning/neutralizing
ag ent in the w ater as needed. On the final
rinse , use only clean, clear w ater .
5. Star t the engine .
6. With the rang e selector in the Neutral position,
press the accelerator pedal to the floor and set
the neutral engine speed loc k switc h to the On
position.
7. Ensure that the agitation control v alv e is in the
On position.
8. Set the pump switc h to the On position and
use the application rate switc h to increase the
pressure to a high setting .
9. Set the master boom switc h and boom control
switc hes to the On positions to begin spra ying .
31

Table of Contents

Related product manuals