EasyManua.ls Logo

VAF instruments OILCON MARK 6M - Bulkhead Penetrations General; Sample Pump; Air Pipelines

VAF instruments OILCON MARK 6M
175 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
29
WARNING:
IN HAZARDOUS ZONES WITH EXPLOSION PROOF REQUIREMENTS THE
COVERS MUST BE TIGHTENED WITH AT LEAST 7 TURNS. IN HAZARDOUS
ZONES WITH INTRINSICALLY SAFE OR NON-INCENDIVE REQUIREMENTS, THE
CIRCUIT ENTITY PARAMETERS AND APPLICABLE INSTALLATION PROCEDURES
MUST BE OBSERVED.
CABLE ACCESS TO WIRING CONNECTIONS IS OBTAINED BY ONE OF THE TWO
CABLE CONDUIT OUTLETS. CONDUIT THREADS SHOULD BE SEALED BY
MEANS OF CODE APPROVED SEALING METHODS. THE UNUSED OUTLET
CONNECTION SHOULD BE PLUGGED ACCORDINGLY. REFER TO SECTION 6.4.3
OF THIS MANUAL FOR FURTHER INFORMATION.
Reference drawings:
Control drawing for Mark 6M Oil Discharge Monitor 0806-0005
Electrical connection diagram Ballast Monitor Mark 6M MEPC 108(49) 0806-2048
Schematic installation diagram Oilcon Monitor System with 1x dP/I
transmitter Mark 6 0806-8035
Bulkhead penetration and piping diagram Mark 6M 0806-8038
Connection diagram dP/I Transmitter type FUJI / ABB 0810-2010
Dimensional drawing dP/I transmitter FUJI flowmeter kit Ballast
Monitor Mark 5/6 0899-1092
Dimensional drawing dP/I transmitter ABB flowmeter kit Ballast
Monitor Mark 5/6 0899-1163
6.4 BULKHEAD PENETRATIONS GENERAL
Great attention has been paid, during the design of the Oilcon
®
Oil Discharge Monitoring and
Control System to minimise the number of bulkhead penetrations which must be made and to make
the total installation as simple and as straightforward as possible.
Nevertheless, two sets of penetrations which must be made.
6.4.1 Sample pump
The requirements for mounting this pump have been detailed in section 6.3.1 of this manual.
6.4.2 Air pipelines
The recommended method for making these penetrations is, using a proprietary transit system, for
which approvals have been obtained such as the Multi Cable Transit system.
It is anticipated that the penetrations will usually be made with standard 6 mm and 10 mm pipe
provided with a pipe connector at each side.
When the Oilcon
®
installation is required to be proven with oil injection, a commissioning engineer
must make connections to the air supply line V11, on both sides of the bulkhead. The installers are
therefore requested: To make at least the V11 bulkhead penetration using a 6 mm pipe connector,
one on each side of the bulkhead penetration. Note that these components are outside VAF
Instrument’s normal scope of supply.
Reference drawings
Schematic installation diagram Oilcon Monitor System with 1x dP/I
transmitter Mark 6 0806-8035
Bulkhead penetration and piping diagram Mark 6M 0806-8038
Multi cable transit Ballast Monitor Mark 6 0806-8070
Parts list air supply units Ballast Monitor Mark 6 0899-1258