53
Vertiv I Liebert LPC I User Manual
19 Cable trays of proper gauges & quality are used. Ensure support is provided at
equal distance to avoid the sag on the cable tray
20 Dressing & proper routing condenser cable
21 Condenser cable & copper pipes are tagged with unit No & circuit no for easy
Sufficient fresh air for condenser
No hot air short-cycling for condenser
Proper earthling is done for condenser
25 Proper supporting given for the condenser incase condensers are mounted
26 Concrete pedestal are provided for the condenser stand
Rubber pads are provided in between the condenser & the stands
Condenser coils & Copper pipes U bends are painted with anticorrosive paint
Proper slope is maintained for the drain pipes
U traps is provided at the end drain pipe
Isolating valve provided on the inlet of humidifier piping
32 Fresh water head pressure maintained of 21 - 100 PSI & with PPM level of 80 to
33 Ensure no leakage in the humidifier & drain piping before commissioning