EasyManua.ls Logo

Vogelsang VX100Q - 9 Maintenance plan

Vogelsang VX100Q
61 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rotary lobe pump
Operating instructions
VX100Q/VX136Q/VX186Q, VX136QD/VX186QD, VX136QDM2/VX186QDM2
52/61
Pos: 249 /Übersc hriften/Überschrif t 1/Wartungspl an @ 59\ mod_13130594 97487_48.doc @ 3 09728 @ 2 @ 1
9 Maintenance plan
Pos: 250 /WBV/P umpen/Wartungspl an/002 Tabelle Wartungshi nweise @ 58\ mod_131236 3377882_48.doc @ 308134 @ @ 1
Start-up*
Before and after longer periods of non-use
After the first 10 operating hours
After the first 20 operating hours
Every 200 operating hours
Every 500 operating hours, at least every 3
months
Every 2000 operating hours, at least once a year
When there is severe contamination
Lubricate grease nipple
X
X
Check belt tension for pumps with belt
drive acc. to accompanying sheet
X
X
X
X
Tighten the screws for the base
X
Checking buffer fluid tank or
quenching fluid tank
X
X
Changing buffer fluid or quenching
fluid
X
X
Change gearbox oil
X
X
Check gearbox oil
X
* chap. "Checklist before start-up"
Pos: 251 /WBV/P umpen/Warnhin weise/Maschi nengefahr/Gleitring dichtung SiC- SiC @ 58\ mod_13122747 37011_48.doc @ 307892 @ @ 1
Pumps with a mechanical seal consisting of the material combination SiC-SiC:
To avoid adhesion of the mechanical seal faces this pump needs to be rotated (at least one revolution) every
two months when not in service.
Pos: 252 /---Seitenum bruch--- @ 21\mod_12 01696136229 _0.doc @ 805 75 @ @ 1

Table of Contents

Related product manuals