EasyManua.ls Logo

Waters 996 - Page 26

Waters 996
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26 Installation
1
Shutdown
To shut down the 996 detector:
1. If the mobile phase contains buffers, set the solvent delivery system or pump to
deliver 1 mL/min of HPLC-grade water for 10 minutes. Otherwise, set the solvent
delivery system or pump to deliver 1 mL/min of degassed methanol for 10 minutes.
2. Press the 0/1 (Off/On) Switch on the front panel of the detector to the
0
(Off)
position.

Table of Contents

Related product manuals