Networking and conguring the EV charging box
92
Operating instructions – AC SMART
Setting up load/charge management
You must be logged in as an Admin. Electrician only!
TheModbusTCPinterfacemustbeconguredasWiFiorEthernet,see
Chapter 9.4. There must be a control box in each charging network. Each
additional EV charging box that is part of the same charging network must be
conguredasasatellitebox.
Steuerbox Satellitenboxen
Image 9.6 Charging network
Click Load Management.
Activate satellite box or control box.
Only for the control box: Enter the desired value for the global current limit
[A].
Only for the control box: enter the IP addresses for all connected satellite
boxes.
Click Save.
The Connectedelddisplayswhethercommunicationbetweenthesatellite
box and control box is possible.
Setting up the OCPP backend connection
You must be logged in as an Admin. Electrician only!
The data required to set up the OCPP connection is available from the
provider of your OCPP backend.
Click Network/Cloud..
Enter the data.
Click Save.
Updating rmware
Toupdatethermware,theEVchargingboxmustbeconnectedtoyour
computer or mobile device via LAN, see Chapter 9.1.Thecurrentrmwareis
available as a download on the Weidmüller website.
Click Cong/General.
Click Select le.
Choosearmwarele.
Click Upload.
TheleisloadedtotheEVchargingbox.Thismaytakeuptooneminute.
AftertheuploadiscompleteticktheboxintheeldUpload Status. The
change is adopted the next time the EV charging box is restarted.
Click Restart.
Prerequisite
Prerequisite