上海维宏电子科技股份有限公司
SHANGHAI WEIHONG ELECTRONIC TECHNOLOGY CO., LTD.
73 / 144
4.2.5 Check Follow-up
This operation is used to check if follow-up commissioning succeeds.
Before checking follow-up, ensure the calibration is successful.
To check follow-up, do the following:
1. Turn on and off the follow-up and observe whether the cutting head shakes and
whether the follow-up distance is correct.
It is suggested to move a screw driver or a tiny metal plate back and forth
under the cutting head and observe whether the cutting head moves up and
down along the position of the screw driver or the metal plate and whether the
cutting head shakes.
2. To improve security, set parameter Out Margin Check as Yes.
3. Draw a toolpath, cut it without turning on laser, and observe whether the
cutting head shakes during following.
4.3 List of Parameters
This section introduces all parameters in System page in Follow-up Control dialog
box, including:
• System setting parameters
See 1.0.2 Z-axis, 1.1.3 Origin Setting (Z), 2.0.0 Jog Speed and 2.0.1 Manual
Acceleration for details.
• Follow-up parameters
• Calibration setting parameters
• Follow-up setting parameters
• Real-time state check parameters
• Speed setting parameters
• Manual speed (Z) parameters
See 1.0.2 Z-axis, 1.1.3 Origin Setting (Z), 2.0.0 Jog Speed and 2.0.1 Manual
Acceleration for details.
• Follow-up outside workpiece parameters