Maintenance
Wear Life
5
5-1 60HDdoc081208 Maintenance
SECTION 5 MAINTENANCE
This section lists the maintenance procedures that need to be performed.
See the Maintenance Log
located after this section for a complete list of maintenance
procedures and intervals. Keep track of machine maintenance by filling in the machine
hours and the date you perform each procedure.
This symbol identifies the interval (hours of operation) at which each maintenance pro-
cedure should be performed.
Be sure to refer to option and engine manuals for other maintenance procedures.
5.1 Wear Life
See Table 5-1. This chart lists estimated life expectancy of common replacement parts if
proper maintenance and operation procedures are followed. Due to the many variables
which exist during sawmill operation, actual part life may vary significantly. This informa-
tion is provided so that you may plan ahead in ordering replacement parts.
Part Description Estimated
Life
Up/Down Motor Brushes 1000 hours
Up/Down Motor 2000 hours
Hydraulic Pump Solenoid 750 hours
Power Feed Motor Brushes 750 hours
Up/Down Drum Switch 1000 hours
Hydraulic Pump Motor Brushes 750 hours
Power Feed Drum Switch 1200 hours
Drive Belt 1250 hours
Power Feed Motor 1500 hours
Up/Down Belt 2000 hours
TABLE 5-1
0