Sawmill Operation
Preparing The Sawmill For Towing
Sawmill Operation 60HDdoc081208 4-18
4
4.11 Preparing The Sawmill For Towing
The Wood-Mizer trailer package makes transporting your sawmill easy and convenient.
To get your sawmill ready for towing, follow these instructions.
1. Move the saw carriage to the front end of the sawmill. Raise the rear outriggers.
See Figure 4-7. Secure outrigger with both Locking Pin and Travel Lock Pin.
CAUTION! Be sure the outrigger base is adjusted properly
before securing in travel position with the lock pin.
CAUTION! Do not adjust the outrigger base height while
there is weight on it. Damage to the outrigger may result.
2. Move the clamp all the way in toward the main bed frame tube.
FIG. 4-7. ADJUSTABLE OUTRIGGER.
Locking Pin
Outrigger Leg
Travel Lock Pi