EasyManua.ls Logo

Wood-mizer LT70L DH - 4.12 Preparing The Sawmill For Towing

Wood-mizer LT70L DH
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sawmill Operation
Preparing The Sawmill For Towing
4
4-19 60HDdoc081208 Sawmill Operation
CAUTION! Move the hydraulic clamp and turner to provide
maximum ground clearance before towing. Failure to do so
may result in damage to the sawmill.
3. Move the carriage forward to the travel position over the rear bed rail. Position the hole in
the saw head over the travel rest pin.
4. Move the rest pin to its travel position. Secure the rest pin using locking pin.
See Figure 4-8.
5. Lower the saw head until it is it contacts the stop blocks on the mast rails. Secure the saw
head with locking clamp.
FIG. 4-8
Rest Pin
Lock Pin

Table of Contents

Other manuals for Wood-mizer LT70L DH

Related product manuals