Sawmill Operation
Preparing The Sawmill For Towing
Sawmill Operation 60HDdoc081208 4-20
4
See Figure 4-9.
CAUTION! It is important that the lower stop bolts are prop-
erly adjusted to secure the carriage on the track rail. Failure
to properly adjust the stop bolts can cause saw head dam-
age, especially during mill transportation.
FIG. 4-9
Locking
Clamp