Sawmill Operation
Preparing The Sawmill For Towing
4
4-21 60HDdoc081208 Sawmill Operation
6. If necessary, adjust the stop located at the bottom of the mast so the saw head contacts
them after it is lowered 3/4" (19mm) past where it contacts the rest pin.
See Figure 4-10.
7. Use the hydraulic controls to raise the log turner and loader as high as they will go. Man-
ually lift the loader and hook the loader chains to the sawmill frame. Use the hydraulic
loader lever to lower the loader until the chains are tight. Push the loader lever down to
bring the loader feet up to the loader arms.
8. Hook the carriage safety chain located at the bottom of the carriage to the bracket at the
bottom of the mast.
FIG. 4-10