EasyManua.ls Logo

Wood-mizer LX55 - Page 42

Wood-mizer LX55
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly
Mount Lift System
3
3-24 LX55 9/17/20 Assembly
3. Adjust one saw head stop bolt to 1” (25mm) below the nylon mast guide.
4. Remove the head locking pins to lower the head to the lowest position.
5. Level the sawhead.
a. Set a level across the top of the sawhead.
b. Adjust the second stop bolt until the head is leveled.
6. Attach the lift cable to the bracket as shown in Fig. 3-32.
NOTE: Set lower lift cable nut to 1/4 of the way up from the bottom of the
threads to allow for adjustment.
7. Route the lift cable through the rollers as shown in Fig. 3-32.
8. Thread the lift cable through the hole in the lift shaft ends until all slack is taken up.
9. Tighten the set screw when the cable is tensioned.
10. Repeat on the other side of the sawhead.
11. Raise and lower the sawhead to check for additional adjustments.
FIG. 3-33
550013
Stop bolt
Mast Guides

Table of Contents

Related product manuals