8.Maintenance
214
6. Install the tire sealant connection tube to
the tire valve and tighten it.
7. Connect the air pump power cord to the
12 V power supply of the vehicle's storage
box.
8. Press the switch to turn on, and the pump
starts to inate the tire.
►
Observe the barometer until the
tire pressure reaches the standard
pressure, then stop.
9. Turn off the air pump and disconnect the
connecting tube from the tire valve. Wipe
off excess tire sealant from the tire valve
and wheel hub.