EasyManua.ls Logo

Zodiac pH Link - ❸ Installing a Ph Link or Dual Link Module; I Installing the Module

Zodiac pH Link
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
❸ Installing a pH Link or Dual Link module
3.1 I Installing the module
Turn the appliance o. Before beginning, disconnect all potenal power supplies to the
appliance.
Close the isolang valves in the pipework.
Remove the cover and unscrew (x2) the boom module, see gure .
Remove the module, see gure .
Connect the 2 cables "SENS" and "PUMP" of the pH Link or Dual Link module to the chlorinator's terminals,
see gure .
Posion the module on the chlorinator according to step and screw (x2) according to step , see
gure .
Replace the cover, see gure .

Related product manuals