EasyManua.ls Logo

3M 965DSP/SA - Page 72

3M 965DSP/SA
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
72
Connect the red and black leads to the pair and press
the [Enter] key. The 965DSP displays the word
“Connectingwhile the instrument goes through
three steps:
1) AIP (Activation in Progress),
2) Sync (Synchronization) , and
3) Link (successful connection).
If any of these three tests is unsuccessful, the words
“Link Failed” will show in the screen.
Once a link is established with an ISDN signal, the
screen will display “Connected” in the main screen.
For countries where interoperability with the 965DSP
ISDN Block Error Test has been verified, the [Enter]
key will appear. Press the [Enter] key to perform an
Error Test on the active ISDN pair.

Table of Contents

Related product manuals