100 Installation checklist
The supply (input power) is connected to U1/V1/W1 (UDC+/UDC- in case of a DC
supply) and the terminals are tightened to specified torque.
Appropriate supply (input power) fuses and disconnector are installed.
The motor is connected to U2/V2/W2, and the terminals are tightened to the specified
torque.
The brake resistor (if present) is connected to R+/R-, and the terminals are tightened to
specified torque.
The motor cable (and brake resistor cable, if present) is routed away from other cables.
There are no power factor compensation capacitors in the motor cable.
The external control connections to the ZCU control unit are OK.
There are no tools, foreign objects or dust from drilling inside the drive.
The supply (input power) voltage cannot be applied to the output of the drive through a
bypass connection.
Motor connection box and other covers are in place.
Check that...