EasyManua.ls Logo

ABB ACS880-M04 - Installation Checklist; Contents of this Chapter; Checklist

ABB ACS880-M04
195 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation checklist 99
8
Installation checklist
Contents of this chapter
This chapter contains a list for checking the mechanical and electrical installation of
the drive module.
Checklist
Check the mechanical and electrical installation of the drive module before start-up.
Go through the checklist below together with another person. Read the Safety
instructions on the first pages of this manual before you work on the unit.
Check that...
MECHANICAL INSTALLATION
The ambient operating conditions are allowable. (See Mechanical installation, Technical
data: Ratings, Ambient conditions.)
The unit is fastened properly to the cabinet. (See Planning the cabinet installation and
Mechanical installation.)
The cooling air will flow freely.
The motor and the driven equipment are ready for start. (See Planning the electrical
installation, Technical data: Motor connection.)
ELECTRICAL INSTALLATION (See Planning the electrical installation, Electrical installation.)
The VAR (frames R1 and R2) and EMC/VAR1/VAR2 (frames R3 and R4) screws are
removed if the drive is connected to an IT (ungrounded) or a corner grounded TN supply
network.
The capacitors are reformed if stored over one year (contact local ABB representative for
more information).
The drive is grounded properly.
The supply (input power) voltage matches the drive nominal input voltage.

Table of Contents

Other manuals for ABB ACS880-M04

Related product manuals