Panel mounting (optional)
Referring to Figure 13: 
1  Cut the correct sized hole in panel A.
2  Insert the transmitter into the panel cut-out B.
3  Screw one panel clamp anchor screw C into the left-hand 
bracket D until 10 to 15 mm (0.39 to  0.59 in) of the thread 
protrudes from the other side of the bracket and position 
one clamp E over the end of the thread.
NOTICE  
The correct torque is critical to ensure proper compression 
of the panel seal and achieve the IPX6/NEMA 4X hosedown 
6.
Dimensions in mm (in)
4  Holding assembly F together, position bracket D into the 
left-hand recess on the rear of the transmitter and secure 
with bracket securing screw G. Ensure that the plastic 
washer remains in the position fitted.
5  Repeat steps 3 and 4 for the right-hand panel clamp 
assembly.
6  Torque each panel clamp anchor screw to 0.5 to 0.6 Nm  
(4.42 to 5.31 lbf/in).
Figure 13  Panel mounting the transmitter
A
B
C
D
E
F
A
G
 
max. thickness 
6 (0.24)
Gasket
Panel cut-out dimensions
30 (1.2)
73 (2.87)
25.5  
(1.00)
138
+1.0 
+0.04 
(5.43       )
138
+1.0 
+0.04 
(5.43        )
30  
(1.2)