ABB AWT210 - Panel Mounting Procedures

ABB AWT210
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AWT210 | 2-WIRE CONDUCTIVITY, PH/ORP, PION TRANSMITTER | OI/AWT210-EN REV. C
13
Panel mounting (optional)
Referring to Figure 13:
1 Cut the correct sized hole in panel A.
2 Insert the transmitter into the panel cut-out B.
3 Screw one panel clamp anchor screw C into the left-hand
bracket D until 10 to 15 mm (0.39 to 0.59 in) of the thread
protrudes from the other side of the bracket and position
one clamp E over the end of the thread.
NOTICE
The correct torque is critical to ensure proper compression
of the panel seal and achieve the IPX6/NEMA 4X hosedown
6.
Dimensions in mm (in)
4 Holding assembly F together, position bracket D into the
left-hand recess on the rear of the transmitter and secure
with bracket securing screw G. Ensure that the plastic
washer remains in the position fitted.
5 Repeat steps 3 and 4 for the right-hand panel clamp
assembly.
6 Torque each panel clamp anchor screw to 0.5 to 0.6 Nm
(4.42 to 5.31 lbf/in).
Figure 13 Panel mounting the transmitter
A
B
C
D
E
F
A
G

max. thickness
6 (0.24)
Gasket
Panel cut-out dimensions
30 (1.2)
73 (2.87)
25.5
(1.00)
138
+1.0

+0.04

(5.43 )
138
+1.0

+0.04

(5.43 )
30
(1.2)