EasyManua.ls Logo

ABB AWT210 - PV Span Calibration

ABB AWT210
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
46 AWT210 | 2-WIRE CONDUCTIVITY, PH/ORP, PION TRANSMITTER | OI/AWT210-EN REV. C
…12 Calibration
Toroidal conductivity sensor calibration
PV Span calibration
1
Apply span and wait for
stable reading
– – – –
PV 752 uS/cm
Continue When Stable
PV Zero Cal
Abort
Continue
Ensure that a span solution is
present at the sensor, monitor the
process value and continue ( ) to
the next step once the value has
stabilized.
2 Enter the new value
PV 752 uS/cm
New
0 752
PV Zero Cal
Next
Continue
Enter the desired PV value by
pressing the key to move the
cursor and the keys to
change the value. When the new
value has been entered press the
key to continue.
3 Sampling
The procedure moves automatically
to the next stage once the PV has
been sampled.
4 Completion
Following a successful calibration
the calculated coefficients are
displayed.
Following an unsuccessful
calibration the reason for failure
is displayed.
PV 752 uS/cm
PV Zero Cal
Abort
– – – –
PV Zero Cal
Exit
PV 752 uS/cm
PV Slope 99.69%
PV Offset 0.00 uS...
– – – –
PV Zero Cal
Exit
PV 752 uS/cm
Calibration Failed
Offset Too High

Table of Contents

Other manuals for ABB AWT210

Related product manuals