EasyManuals Logo
Home>ABB>Adapter>FEPL-02 Ethernet POWERLINK

ABB FEPL-02 Ethernet POWERLINK User Manual

ABB FEPL-02 Ethernet POWERLINK
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #38 background imageLoading...
Page #38 background image
38 Start-up
FEPL-02 configuration parameters – group B (group 2)
Note: The actual parameter group number depends on the drive
type. Group B (group 2) corresponds to:
parameter group 55 in ACS355
parameter group 53 in ACSM1, ACS380, ACS580 and
ACS850
parameter group 53 in ACS880 if the adapter is installed as
fieldbus adapter A or group 56 if the adapter is installed as
fieldbus adapter B.
All parameters in this group are handled by the adapter module
automatically. Do not modify the settings of these parameters.
FEPL-02 configuration parameters – group C (group 3)
Note: The actual parameter group number depends on the drive
type. Group C (group 3) corresponds to:
parameter group 54 in ACS355
parameter group 52 in ACSM1, ACS380, ACS580 and
ACS850
parameter group 52 in ACS880 if the adapter is installed as
fieldbus adapter A or group 55 if the adapter is installed as
fieldbus adapter B.
All parameters in this group are handled by the adapter module
automatically. Do not modify the settings of these parameters.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB FEPL-02 Ethernet POWERLINK and is the answer not in the manual?

ABB FEPL-02 Ethernet POWERLINK Specifications

General IconGeneral
BrandABB
ModelFEPL-02 Ethernet POWERLINK
CategoryAdapter
LanguageEnglish

Related product manuals