EasyManua.ls Logo

ABB IRB 1300 - Page 479

ABB IRB 1300
770 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Refitting the axis-5 timing belt
NoteAction
For robots with protection type Clean Room:1
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
xx2000001595
Install the timing belt to the pulleys and verify that
the belt runs correctly in the grooves of the pul-
leys.
2
Used belt: 59.3-63.4 HzMove the motor to achieve proper belt tension.3
New belt: 70.8-74.3 Hz
Use a sonic tension meter to measure the timing
belt tension.
4
If the timing belt tension does not meet the require-
ment, loosen the motor screws and readjust.
Tightening torque: 6 Nm
xx2000001594
Secure the motor with the screws.5
Routing the cable package in the tubular
NoteAction
For robots with protection type Clean Room:1
Clean the joints that have been opened and wipe
the parts free from particles with spirit on a lint
free.
Continues on next page
Product manual - IRB 1300 479
3HAC070390-001 Revision: G
© Copyright 2020-2022 ABB. All rights reserved.
5 Repair
5.5.3 Replacing the tubular and tilt unit
Continued

Table of Contents

Related product manuals