Operation Manual / Power2 850-M / 4.1 Low-pressure stage
5
Taking out of operation at short notice
Page 40 /
49
© Copyright 2015 ABB. All rights reserved.
HZTL4062_EN
Revision -
December 2015
5.1.1 Manufacturing the cover plate
The cover plate and the other parts that are required are not included in the scope of delivery of
ABB Turbo Systems and must be manufactured in accordance with the drawing (see Figure 32)
by the operator.
Required parts
1 cover plate (01) (recommended material: 1.4541 / 1.4571)
1 gasket (02) (temperature resistant up to 550 °C)
8 additional screws (03) to the screws (42087) from the scope of delivery
15 sleeves (04)
Figure 32: Cover plate / gasket, sleeves and screws
Cover plate (gasket), sleeves and screws, dimensions [mm]
Ø1
Ø2
Ø3
Ø4
Ø5
B1
B2
658 600 14 14 20 10 32
Table 18: Cover plate / gasket