EasyManua.ls Logo

ABB Power2 850-M16 - Page 164

ABB Power2 850-M16
178 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / Power2 850-M / 4.2 High-pressure stage
4 Disassembly and assembly / 4.10 Installing the cartridge group
© Copyright 2017 ABB. All rights reserved. HZTL4063_EN Revision A August 2017
Control dimension after installing cartridge group
Fig.18: Measuring control dimension X
After installing the cartridge group, the control dimension (X) must be measured.
Control dimension X
[mm]
49.0 ±0.2
Table9: Control dimension X
CAUTION
Control dimension outside the tolerance value
If the control dimension is out of tolerance, the cartridge group has not
been correctly installed and can be the cause of serious damage to the ma-
chine or property.
u Remove and reinstall the cartridge group.
u Always replace jammed gasket rings with new ones.
u If the control dimension is still out of tolerance, contact an ABB Tur-
bocharging Service Station.
Page 22 / 35

Table of Contents

Related product manuals