Storing, lifting and transporting 31
Lifting the megawatt station
Protect the corners of the megawatt station against shock.
Lift the megawatt station from the four lifting eyes in the upper corners or bottom
corners, according to ISO 3874 for HQ 40' type A.
The minimum rated loading capacity of each sling is 10 tons.
The minimum length of each sling is 5 m.
Adjust the lengths of the lifting slings so that the megawatt station does not tilt during
the lifting.
Do not allow the lifting slings to scratch the walls or roof. Damaged paint can lead to
corrosion.
Use a guide wire attached to a lower corner of the megawatt station to prevent
rotation.
Use only authorized lifting equipment and personnel.
Prevent anybody getting under the load.
Do not stand on the roof while fastening the lifting slings or while lifting.
Do not throw slings or hooks onto the roof.