36 Mechanical installation
Placing the MWS on the foundations
WARNING! Before you lift the megawatt station onto the foundations, make sure
the foundations are well aligned, hardened and stable.
1. Measure the level of the foundation and the tilting of the surface of the surrounding
ground around the foundation. Make sure that you obey the rules in Constructing the
foundation on page 34.
2. Make sure that the foundation is level. The maximum permitted incline of the
foundation below the megawatt station is 0.1 degrees.
3. Lift the megawatt station onto the foundation. Obey the instructions in Lifting the
megawatt station on page 31. Make sure that the column foundations do not move
during lifting and that they remain vertical. The megawatt station must be stable and in
direct contact with all of the foundation columns.
4. When the megawatt station is on the foundation, measure the height and inclination of
the megawatt station and examine the slope of the surface of the surrounding ground
around the megawatt station. Refer to Constructing the foundation on page 34.
WARNING! Before you start the cabling work, make sure that the installation is
stable.
Unpacking
Before the installation, unpack the megawatt station from the transportation and storage
package. Remove the protective canvas. To prevent damage to the megawatt station,
unpack the megawatt station as late as possible before the installation. Refer to Technical
data on page 61 for the permitted operating conditions, and Dimension drawings on page
63.
Adding the cables
Add cables and cabling protection. Refer to Electrical installation on page 39.