EasyManuals Logo

Agilent Technologies 2200 User Manual

Agilent Technologies 2200
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #46 background imageLoading...
Page #46 background image
46 Agilent 2200 TapeStation System - User Manual
4 Using the 2200 TapeStation System
Operating Procedure
Start the Run
1 Click the start button.
This will produce a Save As window.
As a default the file name starts with the date, in reverse order, and a
run counter. When run continuously, the save function auto increments
the counter part of the file name.
2 Type in the name that you wish the analysis to be saved as. Do not
include a full stop ( . ) in file names.
Final Check
2200 TapeStation Controller Software:
1 Lift the lid of the 2200 TapeStation instrument.
2 Ensure that there are fresh tips in the tip holder and that all the
samples have been correctly loaded with lids removed and correspond
to the sample selection on the screen.
3 Close the lid.
NOTE
Lifting the lid of the 2200 TapeStation instrument after this time will abort the experimental
run.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 2200 and is the answer not in the manual?

Agilent Technologies 2200 Specifications

General IconGeneral
BrandAgilent Technologies
Model2200
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals