EasyManua.ls Logo

Arjo Citadel - Installation

Arjo Citadel
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
Citadel Bed Frame System
INSTALLATION
The following chapter describes how to install the bed.
Weighing System Preparation
To prevent damage to the weighing mechanism, replace the transport
ORFNLQJEROWVDQGZDVKHUVEHIRUHWUDQVSRUWLQJWKHEHG7KLVLVQRW
QHFHVVDU\ZKHQPRYLQJWKHEHGVKRUWGLVWDQFHV
When replacing the transport locking bolts care must be taken to
DYRLGWUDSSLQJRUGDPDJLQJDQ\FDEOHV
3RVLWLRQWKHEHGRQDÀDWOHYHOVXUIDFHDQGDSSO\WKHEUDNHV
Remove the four transport locking bolts (1) and washers (2); there are two locking
bolts at the head end of the bed and two at the foot end.
)LJXUH5HPRYLQJWKHWUDQVSRUWEROWV
Retain the bolts and washers in case the bed needs to be transported at a later date.
2
1
2
1

Table of Contents

Related product manuals